1.Clamp the cam box to the test bench.
2.Clamp to pump assembly tool to bench table .
3.Assembly the pump to the block by using assembly tool .
4.Fix the energy cable to the pump .
5.Move the block on to the cam box and fixed.( be aware some type is needed distance ring during clamping.)
6.Plug in the encoder cable to the control unit .
7.ON the control unit before bench motor.
8.Chose the test type from control unit.
9.Adjust the advance, peak time and pulse duration on the screen as it given on the test plan.
Not: Suggested warming test step 600 rpm and 2000 us pulse duration.
10.Connect to energy cable.
11.Press to Start button and run bench motor.
12.After warming test step start to test as given on the test plan.